- Pretreatment of collagen production line: According to the source of raw materials, the origin, the type of fish, the storage and transportation of raw materials, the pretreatment equipments are different. The usual operation process is: the raw material frozen warehouse is measured and discharged, and the raw materials are selected and transported. Broken, dynamic cleaning delivery, fine crushing, metering into the mixing trough of raw materials. The pretreatment design plays a key role in the production of the entire collagen. For the later miscellaneous, equipment production efficiency and cooking, enzymatic hydrolysis time has a certain impact. The pre-treatment is made of stainless steel and is in compliance with sanitary requirements.
- Cooking: The second section of the production of collagen peptide is extracted by steaming. After the pre-treated raw material is transported by the pump, it enters the cooking tank, is sterilized, extracted, heated and separated, solid-liquid separated, and the bone slag is sent out. The pump is sent to the separation tank for low temperature water sedimentation, degreasing and temporary dehydration.
- Enzymatic hydrolysis: After the second stage treatment, the protein solution enters the aseptic automatic constant temperature enzymatic hydrolysis system, enzymatic hydrolysis, inactivation, blending, decolorization, separation of ancient liquid, slag removal, membrane filtration and other processes.
- Refined and dried: The enzymatically decomposed and filtered small-molecule collagen product, after temporary storage, enters the falling film evaporative concentrator through a sterile pipe, and enters the drying tower through the feeding system for hot air drying. Equipped with collagen powder transfer truck, enter the aseptic packaging room for packaging, inspection and storage.
- Other supporting equipment for the collagen peptide production line include water treatment, CIP cleaning station and other equipment, steam power system and system cooling system, heat recovery system, sewage discharge system and so on. Our company can undertake engineering design, technical consultation, equipment processing, engineering manufacturing, system installation, commissioning training and so on. With mature production cases, the revised process is more advanced, and new and old customers are welcome to consult and negotiate.
Function Dressing
Soft Comfortable Dressing,Breathable Dressing,Silicone Dressing,Custom Hydrocolloid Dressing
Zhende Medical Co.,Ltd , https://www.zdmedicalproducts.com